Menu
Specs & Setup About Case Studies Pricing
Talk to Us 01233 456 789
Case Studies

Real sites, real numbers.

What we installed, what it ran, and what it saved. Written up job by job as we complete them.

Based in Kent · Serving the South of England

Solar array mounted along site hoarding
Construction Kent · March 2026

Powering a fenced site with no mains connection.

A groundworks contractor needed power for two welfare units, a CCTV mast and site lighting on a plot with no supply. We mounted the array along the boundary hoarding and ran the site off battery for the duration.

17.4 kWh storage
18 weeks on site
0 litres diesel
Read the full study

Got a site that needs power?

Tell us what you're running and where. We'll come back with what we think would work.

Get an estimate