Menu
Specs & Setup About Case Studies Pricing
Talk to Us 01233 456 789
Pricing

What a system costs.

Every system is built for the site it's going to, so the final figure depends on the job. These are the starting points.

Based in Kent · Serving the South of England

Base Unit

Smaller sites and short runs.

From £3,000 ex VAT, installed
  • 4 × 400W panels
  • 5kW inverter
  • 5.8kWh battery storage
Typically runs

A CCTV mast and LED site lighting, or a single welfare cabin through the working day.

Get an estimate
Most common

Base + 1 Pack

Full site setups running overnight.

From £4,500 ex VAT, installed
  • 8 × 400W panels
  • 5kW inverter
  • 11.6kWh battery storage
Typically runs

Welfare cabin, CCTV, site lighting and tool charging together, with headroom overnight.

Get an estimate
Built to spec

Custom Build

Anything that doesn't fit a standard build, large or small.

Priced Per site once we've seen the job
  • Panels and storage sized to the actual load
  • Scaled down as readily as scaled up
  • Awkward mounting, split arrays, tight access
Typically runs

A single pump on a remote plot, a wall with nowhere obvious to mount, or a compound needing more than one unit.

Talk to us

Not sure which you need? Try the capacity estimator →

Included as standard

No day-rate surprises.

The price you're quoted covers the system on your site and working. These aren't extras.

Delivery to your site

Brought out by us in the van. No third-party haulage, no waiting on a slot.

Setup and commissioning

Mounted, wired in and tested. Around 20 minutes on a straightforward site.

Configuration for your site

Panel count and placement worked out around your loads, not a standard kit.

Mounting hardware

Fence, wall or hoarding brackets included. No scaffold, no ground fixings.

Handover on site

We walk your team through it before we leave. No manual to decipher.

Aftercare and support

Ring us if anything's not right. You'll get one of the two people who installed it.

Straight answers

What moves the number.

We'd rather tell you what changes the price than send a quote that looks nothing like the figure on this page.

Tell us about the job and we'll come back with a number you can actually budget against.

01

How much you need to run

Panel count and battery packs are the biggest single factor. More load, more of both.

02

What we're mounting to

Temporary fencing, hoarding, a boundary wall or a building all need different brackets.

03

Where the site is

We're Kent-based and cover the South of England. Distance and access affect the install.

04

How it ties in

Running standalone is simpler than wiring into an existing consumer unit or a grid supply.

05

How long it's staying

A system that moves between sites gets specced differently to one that stays put.

Worth knowing

Why is it better than diesel generators?

A generator keeps costing you long after it turns up, and brings a fair bit of hassle with it. Here's the difference, line by line.

With a diesel generator

  • Fuel, every week the job runs
  • Someone has to order it and be there when it lands
  • Servicing, and a call-out when it won't start
  • Spill trays, safety checks and fuel paperwork
  • Takes up room you could be working in
  • Too loud for some sites, and for some hours
  • You hand it back when the job ends

With a Solar on Site unit

  • No fuel to buy
  • Nothing to order, nothing to wait in for
  • No engine, so there's almost nothing to go wrong
  • No fuel on site, so none of that applies
  • Sits on the fence, out of the way
  • Silent, so it works where diesel can't
  • It's yours, ready for the next job
FAQ

Pricing questions

Not at the moment. We source and install each system for the site it's going to, and it's yours from there. Hire is something we're looking at for the future — if that's what would suit your job, tell us and it'll help us work out where to take it.

Because no two sites need the same thing. A welfare cabin on a fenced plot and a farm outbuilding half a mile from the nearest supply are different jobs, and pretending otherwise would mean quoting you for kit you don't need. The figures above are honest starting points for the two standard builds, and anything that doesn't fit either one we price on the job.

Delivery and setup across our usual patch are included in the quoted figure. If you're at the far edge of the South of England or the site has awkward access, we'll say so up front rather than adding it on afterwards.

Yes — that's the point of the modular build. Start with the base unit and add battery packs or panels when your loads grow. Nothing gets replaced, it gets added to.

Want a figure for your site?

Tell us what you're running and where. We'll come back with what we think would work, and what it would cost.

Get an estimate